Last week we completed machining all of the chassis pieces for our 2010 IGVC ‘bot. Today we test fitted the pieces together to make sure the design didn’t need any adjustments. We discovered that some of the pieces needed some holes to be tapped, but otherwise, it went together like a charm and things are fitting just as our CAD model predicted. Photos of the construction process after the break.

Above: PAVE President Derrick Yu preparing 80/20 bars for assembly on the 2010 IGVC robot chassis (Photo by Lazslo Szocs)

Above: FIRST Team 1923 members will laugh when they see this. Even college students can snap taps off too. Looks like we’ll need a new tap and a replacement bar. (Photo by Lazslo Szocs)
You can see these photos and more on our Facebook page and our Flickr group. Stay tuned for further updates about the IGVC build status and more photos (and possibly video)!